The government of the United Republic of Tanzania is committed to ensuring reliable, affordable, sustainable, inclusive, and clean energy for all. This National Energy Compact project delivers infrastructure in Pangani District.
Framework contract for electricity infrastructure development under Tanzania National Energy Compact, Muheza District.
Oil Mist Separators are used for reducing emissions from crankcase gases. It reduces up to 99.9% of oil from crankcase oil by separating it from gases and circulating back to engine sump.
FinnSonic Corus Bravea is an Ultrasonic cleaning machine. Powerful for removal of oil and dust from large engine parts, ideal for industrial engine maintenance.
Ongoing works involving the upgrade and refurbishment of electrical systems, infrastructure improvements, and safety enhancements to ensure modern operational standards.
Supply and installation of industrial-grade air conditioning systems for the Kidatu Hydropower Plant powerhouse and dispensary to maintain optimal operating conditions.
Supply and installation of heavy-duty engine room ventilation systems for the Somanga Fungu Gas Power Plant to ensure safe and efficient operations.
Delivered complete transformer installation and power distribution works for six TOTAL service stations across Tanzania.
Upgraded and modernised the electrical infrastructure at the Kurasini depot, enhancing safety and operational reliability.
Conducted a full compliance and performance audit for GAPCO facilities, identifying risks and recommending upgrades.
Inspected and assessed transformer performance across five depots, providing detailed condition reports and compliance recommendations.
Supplied and installed high-durability lighting poles and fixtures, enhancing outdoor illumination and safety at BOT facilities.
Provided high-quality grounding materials to maximize electrical safety and stability for a large-scale mining substation.
Executed energy metering upgrade, constructed HT and LV lines, and installed a 500KVA transformer to improve power monitoring and distribution efficiency.
Conducted thorough audits of electrical systems to evaluate compliance, identify risks, and recommend upgrades across DSM, Arusha, Dodoma, Iringa, Morogoro and Lindi.
Performed scheduled servicing of a 500KVA transformer to improve safety, maintain performance, prevent downtime, and ensure continued operational safety.
Supplied advanced gas detection units designed to improve safety monitoring and hazard prevention in industrial environments.
Delivered and supplied backup battery systems to ensure uninterrupted power availability for critical substation operations across 10 TANESCO substations.
Installed energy-efficient motor control systems to maximize operational performance and reduce electricity consumption at BOT Zanzibar branch.
Supplied, installed, and commissioned new UPS batteries, strengthening the power backup capacity at multiple BOT branches nationwide.
Provided essential spare parts for UPS systems, ensuring reliable and continuous power for critical equipment at GASCO facilities.
Supplied high-quality FLUKE testing and measurement instruments to support accurate diagnostics and measurement work at GASCO.
Delivered Motorola communication system spares to maintain secure and efficient industrial communications at GASCO operations.
Supplied and installed a high-capacity rectifier to meet the plant's demanding industrial power conversion requirements.
Installed industrial-grade air conditioning systems to maintain optimal climate control in gas processing and pipeline facilities.
Delivered precision load cells for heavy-duty weighing applications in road construction and infrastructure projects in the Mara Region.