Projects

Ongoing

SUPPLY AND INSTALLATION OF MEDIUM VOLTAGE LINES, LOW VOLTAGE LINES, DISTRIBUTION TRANSFORMERS AND CONNECTION OF CUSTOMERS UNDER TANZANIA NATIONAL ENERGY COMPACT PROJECTS FOR TWO (2) YEARS FRAMEWORK CONTRACT-Pangani District

The government of the United Republic of Tanzania is committed to ensuring reliable, affordable, sustainable, inclusive, and clean energy for all. This National Energy Compact serves as a roadmap to accelerate the pace of access to energy toward that goal. One of the measures to achieve this is to expand electricity connectivity to an additional 8.3 million households by 2030, raising the national electricity connectivity rate from 46 percent in 2022 to 75 percent in 2030.
Ongoing

SUPPLY AND INSTALLATION OF MEDIUM VOLTAGE LINES, LOW VOLTAGE LINES, DISTRIBUTION TRANSFORMERS AND CONNECTION OF CUSTOMERS UNDER TANZANIA NATIONAL ENERGY COMPACT PROJECTS FOR TWO (2) YEARS FRAMEWORK CONTRACT-Muheza District

The government of the United Republic of Tanzania is committed to ensuring reliable, affordable, sustainable, inclusive, and clean energy for all. This National Energy Compact serves as a roadmap to accelerate the pace of access to energy toward that goal. One of the measures to achieve this is to expand electricity connectivity to an additional 8.3 million households by 2030, raising the national electricity connectivity rate from 46 percent in 2022 to 75 percent in 2030.
Ongoing

Supply of Oil Mist Separators for Engine Oil Breather of Five Generating Sets of 45MW Tegeta Power Plant

Oil Mist Separators are used for reducing emissions from crankcase gases. It reduces up to 99.9% of oil from crankcase oil by separating it from gases and circulate back to engine sump and used again for engine lubrication. If not separated from crankcase gases, this oil will cause oil emission to the environment. 45MW Tegeta Plant, owned by TANESCO has 5 generating sets which produce 45 MW, these separators will be installed in all five genering sets.
Ongoing

Supply, Installation and Commissioning of Cleaning Machine for Charge Air Coolers-Contract no: TR212/2024/2025/G/114

FinnSonic Corus Bravea is Ultrasonic cleaning machine, Powerful for removal of oil and dust from large engine parts. FinnSonic Corus Bravea is making your industrial parts cleaning easy with a single tank and powerful ultrasonic technology. Parts up to 1000kg can be cleaned safe and easy with top quality results. It is designed to clean large objects with the best result in short time and with low energy consumption.
Ongoing

Rehabilitation of TOTAL Service Stations in Gairo and Dodoma Town

Ongoing works involving the upgrade and refurbishment of electrical systems, infrastructure improvements, and safety enhancements to ensure modern operational standards at the two service stations.
Completed

Supply and Installation of 11KV transformers and construction of HT and LV systems for 6 TOTAL Service Stations.

Delivered complete transformer installation and power distribution works for six TOTAL stations.
Completed

Electrical renovation of VIVO (Engen) Dar es Salaam Depot-Kurasini

Upgraded and modernized the electrical infrastructure at the Kurasini depot.
Completed

Annual Electrical Audit – GAPCO TANZANIA LIMITED

Conducted a full compliance and performance audit for GAPCO facilities.
Completed

Electrical Audit of transformers of Oryx Gas Tanzania depots in Iringa, Dodoma, Moshi, Mwanza and Kigamboni

Inspected and assessed transformer performance across five depots.
Completed

Supply and Construction of Street Lights complete with hot dip-galvanized poles for Bank of Tanzania (Zanzibar)

Supplied and installed high-durability lighting poles and fixtures, enhancing outdoor illumination and safety at BOT facilities.
Completed

Supply of Earthing Materials for 10MVA substation at Stamigold Mine, Geita

Provided high-quality grounding materials to ensure electrical safety and stability for a large-scale mining substation.
Completed

Energy Meter Separation – PSSSF Millennium Tower

Implemented an energy metering upgrade, constructed HT and LV lines, and installed a 500KVA transformer to improve power monitoring and distribution efficiency.
Completed

Electrical Audit for 11 PUMA Service Stations

Conducted thorough audits of electrical systems to evaluate compliance, identify risks, and recommend upgrades across multiple regions.
Completed

Annual Electrical Maintenance – TOTALENERGIES LOBP Plant

Performed scheduled servicing of a 500KVA transformer to maintain performance, prevent downtime, and ensure continued operational safety.
Completed

Supply of Gas Detectors for Gas Company TZ LTD

Supplied advanced gas detection units designed to improve safety monitoring and hazard prevention in industrial environments.
Completed

Supply of 110VDC batteries for 10 Tanesco Substations

Delivered and supplied backup battery systems to ensure uninterrupted power availability for critical substation operations.
Completed

Supply and Installation of Variable Speed Drives – Bank of Tanzania (Zanzibar)

Installed energy-efficient motor control systems to optimize operational performance and reduce electricity consumption.
Completed

UPS Battery Supply and Installation – Bank of Tanzania (DSM, Zanzibar, Mwanza, Mbeya

Supplied, installed, and commissioned new UPS batteries, strengthening the power backup capacity at multiple BOT branches.
Completed

Supply of Electrical Spare Parts – GASCO

Provided essential spare parts for UPS systems, ensuring reliable and continuous power for critical equipment.
Completed

Supply of Instrumentation Spare Parts (FLUKE) – GASCO

Supplied high-quality FLUKE testing and measurement instruments to support accurate diagnostics and maintenance work.
Completed

Supply of Instrumentation Spare Parts (MOTOROLA) – GASCO

Delivered Motorola communication system spares to maintain secure and efficient industrial communications.
Completed

Supply of Heavy Duty Rectifier – Tanesco Tegeta Gas Plant

Supplied and installed a high-capacity rectifier to meet the plant’s demanding industrial power conversion requirements.
Completed

Supply, Installation and Commissioning of Air Conditioners – Madimba GPP, Songosongo GPP, Gas Pipeline

Installed industrial-grade air conditioning systems to maintain optimal climate control in gas processing and pipeline facilities.
Completed

Supply of 30T Load Cells – Tanroads Mara Region

Delivered precision load cells for heavy-duty weighing applications in road construction and infrastructure projects.