Supply, Installation and Commissioning of Cleaning Machine for Charge Air Coolers- Contract No: TR212/2024/2025/G114
π
Published: August 18, 2025
FinnSonic Corus Bravea is Ultrasonic cleaning machine, Powerful for removal of oil and dust from large engine parts. FinnSonic Corus Bravea is making your industrial parts cleaning easy with a single tank and powerful ultrasonic technology. Parts up to 1000kg can be cleaned safe and easy with top quality results. It is designed to clean large objects with the best result in short time and with low energy consumption.
Supply of Oil Mist Separators for Engine Oil Breather of Five Generating Sets-Contract number:TR212/2024/2025/G/124
π
Published: August 18, 2025
Oil Mist Separators are used for reducing emissions from crankcase gases. It reduces up to 99.9% of oil from crankcase oil by separating it from gases and circulate back to engine sump and used again for engine lubrication. If not separated from crankcase gases, this oil will cause oil emission to the environment. 45MW Tegeta Plant, owned by TANESCO has 5 generating sets which produce 45 MW, these separators will be installed in all five genering sets.
CACLA ENGINEERING LIMITED COMPLETES MAJOR INFRASTRUCTURE PROJECT
π
Published: July 28, 2025
The project, which began in January 2024, involved the installation of advanced electrical systems and plumbing infrastructure for a new commercial complex. Our team of certified engineers and technicians worked diligently to ensure all systems meet international standards.
Key achievements include:
- Installation of 500+ electrical outlets with modern safety features
- Complete plumbing system for 15 floors
- Advanced fire safety and alarm systems
- Energy-efficient LED lighting throughout the complex
This project demonstrates CACLAβs commitment to delivering high-quality engineering solutions that meet our clientsβ needs while adhering to strict safety and quality standards.
For more information about our services, please contact our office in Dar es Salaam..
Key achievements include:
- Installation of 500+ electrical outlets with modern safety features
- Complete plumbing system for 15 floors
- Advanced fire safety and alarm systems
- Energy-efficient LED lighting throughout the complex
This project demonstrates CACLAβs commitment to delivering high-quality engineering solutions that meet our clientsβ needs while adhering to strict safety and quality standards.
For more information about our services, please contact our office in Dar es Salaam..